SF-600 Clean

SF600

Bolting Pattern:

233-250 PCD x 4 x 22mm holes -
350-400 PCD x 4 x 26mm holes -
432-500 PCD x 8 x 32mm holes

Driving Pins:

16 x 32nb (nominal bore)
42.4OD Galvanized pipe -
Light, Medium, Heavy

Load Capacity:

Up to 360kN

Average installation time:

40 minutes approx.

Led Sign

Commercial Signs

For use in the construction of commercial and industrial signage, the Surefoot foundation system can be used for the fast, efficient and secure erection of signs regardless of size and in hard to access areas. From road signs to billboards to commercial signage, the Surefoot footing enables a quick installation that is suitable for both permanent and temporary signage with the ability for removal, reuse and reinstallation as required. A multi-purpose foundation the Surefoot system is an innovative alternative in all construction applications where a concrete footing can be used.

products-sf600-2

Bridges

The Surefoot steel footing system offers instant bearing capacity with no curing time and the ability to be installed, removed and reused in separate locations as required. Delivering a distinct advantage over the use of traditional foundations in the construction of both temporary and permanent bridges, it is suited for use in difficult to navigate areas. This revolutionary footing system has minimal impact on the surrounding flora and fauna and will not erode river banks. Reducing the need for heavy equipment traditionally required for earthworks, the Surefoot system offers precision and efficiency and will enable both the construction and use of a bridge within the same day. With untapped potential within many industry’s including the military this innovative concrete free footing system will continue to revolutionise the way builders and the construction industry operate.

products-sf600-3

Turbines

The use of Surefoot in the erection of turbines offers a cost effective and time efficient alternative to the traditional concrete footing. Turbines are more commonly located in remote areas that require a higher cost of labour and construction materials. The Surefoot steel footing system significantly reduces labour time and requires a smaller volume of materials, ensuring profit margins are heightened. Due to the compact nature of the Surefoot system a foundation for a multiple wind turbine may fit into the back of a ute eliminating the costly need for a cement truck and excavator to be driven on site in which to dig the foundation.

The Steel Foundation of the Future

With an average installation of 10 minutes. choose the cost effective, market leading steel foundation from Surefoot. Call today on 1300 397 122 to discuss your residential and small extension structural needs.