Facebook
Instagram
(03) 9354 4950
sales@surefoot.melbourne

Screw Pile Foundations Melbourne | Surefoot Footing

Menu
  • Home
  • About Us
  • Products
    • Pile Cap T150
    • Pile Cap S250
    • Pile Cap S400
    • Pile Cap S500
    • Pile Cap S600
  • Services
  • case studies
  • Gallery
    • Residential
    • Commercial
    • Civil Works
    • Video gallery
  • Blog
  • FAQ
  • Downloads
  • contact

Pile Cap T150

T150

  • Bolting Pattern:
    147mm x 3 x 16mm Holes
  • Micro Piles:
    3 x 32NB (Nominal Bore) 42.4OD
    Galvanised Pipe Light, Medium, Heavy
  • Load Capacity:
    Up to 25kN
  • Average installation time:
    10 minutes approx.

Fencing Footing

Regardless of the fencing material chosen, without the correct footing in place the overall integrity of the fence is compromised. Inadequate footings will lead to fence leaning over time impacting both the aesthetics and functionality of the fence. The Surefoot Footing is a stabilising infrastructure that can be used in any penetrable soil, including silts, clays, small gravels and even rock. A multi-purpose footing, the Surefoot system is an innovative alternative in all construction applications where a concrete footing can be used.

The Pile Cap T150 the Solar Industry’s Footing of Choice

The footing selection is a critical component in the installation of PV solar panel support structures found on solar farms the world over. Working as tension foundations the Surefoot Footing effectively negotiates uplift forces generated by wind or excessive movement, ensuring both stability and flexibility without loss of functionality. With an average installation time of 10 minutes, the Pile Cap T150 has been developed to accommodate site specific footing and soil types depending on geographical and climatic ranges.

Decking with Surefoot

Manufactured to support a varied selection of deck sizes, the Pile Cap T150 will install quickly and cleanly and is both cost effective and efficient. Ideal for residential decks it is also used for larger decking projects such as those found at mining camps and accommodation structures. With an average installation of 10 minutes (depending on the project size) protect the construction of small extension projects with Surefoot concrete free footings.

The Steel Footing of the Future

With an average installation of 10 minutes. choose the cost effective, market leading steel foundation from Surefoot. Call today on (03) 9354 4950 to discuss your residential and small extension structural needs.

Who We Work With

home_logo_slider

‹ ›

Our Address
2/10 Dairy Drive Coburg North, VIC 3058
sales@surefoot.melbourne
(03) 9354 4950
Quick Links
  • Home
  • About Us
  • Blog
  • FAQ
Products
  • Pile Cap T150
  • Pile Cap S250
  • Pile Cap S400
  • Pile Cap S500
  • Pile Cap S600
Edison Award
Facebook
Instagram
© 2021 surefootfootings. All Rights Reserved. | SEO Melbourne & Digital Marketing Melbourne By Zib Digital
Surefootfootings Reviews: Reviewed by 4 Clients. Rated: 4.5 / 5