Bolting Pattern:
140mm centres x 4 x 22mm holes
Micro Piles:
4 x 32NB (Nominal Bore) 42.40D
Galvanised Pipe Light, Medium,Heavy
Load Capacity:
Up to 75kN
Average installation time:
10 minutes approx
Bolting Pattern:
140mm centres x 4 x 22mm holes
Micro Piles:
4 x 32NB (Nominal Bore) 42.40D
Galvanised Pipe Light, Medium,Heavy
Load Capacity:
Up to 75kN
Average installation time:
10 minutes approx
The Surefoot steel footing system will speed up you construction program! It is the footing of choice as it is cleaner and greener in comparison to other footing systems as there is minimal disturbance to your building site.
It can hold up to 75 kN and has an average installation time of 10-15 minutes. Surefoot provides instant bearing capacity and can be built on once all micro piles have been installed and the pile cap bedded down.
It significantly reduces labour time, ensuring heightened profit margins. High strength and coating mass, the S 250-4 model is generally used for residential projects. Ideal for construction sites
with limited access it can be used in all soil types and perfect to use in remote and difficult access building sites. Surefoot footings can be fully recyclable, as the pile cap has the potential for re use.
With an average installation time of approximately 10 minutes, the use of a Surefoot Footings Pile Cap S250 will provide a sturdy footing in which to pour a concrete slab, ensuring reduced down time between the construction stages.
Effectively negotiating the impact of reactive soil issues when building homes, the concrete slab is suspended allowing the soil to move beneath without pressure to the slab.
Offering cutting edge steel footings that are suitable for all construction work in need of a foundation, the Surefoot concrete free footing provides superior loading capabilities when compared to screw piers and conventional footings such as bored and concrete piers. Both quick to install and dismantle the footings are fully recyclable and can be returned to their raw state in order to produce more steel footings when required.
Providing optimal stability and minimal soil and substrate disruption, they are the footing of choice for cyclone tie downs. Tested and certified in cyclonic prone areas, ensure your building project is optimally protected and built to withstand uplift, shear and environmentally challenging conditions. The Surefoot can be installed in all wind categories.
Preparation is key when planning construction in collaboration with your local council.The construction of a public structure is heavily regulated and requires absolute precision.
Not only is there personal and public liabilities involved, the structure needs to be secure and meet regulatory requirements when used by children. The Pile Cap S250 will create a footing that spreads over a greater surface area, achieving larger load capacities in a cost effective, secure and time efficient manner.
A retaining wall typically is one that is built to sustain a significant lateral soil pressure and may be a curved, short or even tall retaining wall.
The Pile Cap S250 forms a steel footing that connects the structure to the ground with security, flexibility and the ability to handle large bending moment loads and differing site soil conditions. Neither a shallow nor deep structure it is a hybrid footing system that has eclipsed the use of both screw piers and bored piers.
From modular residential homes to large decking projects, the Pile Cap S250 is superior to the more traditional foundation such as screw piers in cost effectiveness, labour and time efficiency.
Designed to adapt to undulating terrains and ground movements, this concrete free foundation system is ideal for construction sites with limited access and will negotiate various soil types, ensuring your housing project is supported by the fully recyclable.
With an average installation of 10 minutes, choose the cost effective, market leading steel foundation from Surefoot. Call today on (03) 9354 4950 to discuss your residential and small extension structural needs.