Bolting Pattern:
350-400 PCD x 4 x 26mm holes
432-500 PCD x 4 x 32mm holes
Micro Piles:
16 x 32NB (Nominal Bore) 42.4OD
Galvanised Pile Light, Medium, Heavy
Load Capacity:
Up to 300kN
Average installation time:
40 minutes approx.
Bolting Pattern:
350-400 PCD x 4 x 26mm holes
432-500 PCD x 4 x 32mm holes
Micro Piles:
16 x 32NB (Nominal Bore) 42.4OD
Galvanised Pile Light, Medium, Heavy
Load Capacity:
Up to 300kN
Average installation time:
40 minutes approx.
Our largest model is designed to take higher loads and is used mainly in the commercial and renewable energy sector. The recommended maximum capacity is 300kN. It has an average installation time of 40 minutes.
The S 600 – 16 pile model can be used on its own or in combination to negate higher bending moment loads.
Surefoot provides instant bearing capacity and can be built on once all micro piles have been installed
and the pile cap bedded down. This provides the opportunity to reach maximum cost and time efficiency within your construction program
For use in the construction of commercial and industrial signage, the Surefoot foundation system can be used for the fast, efficient and secure erection of signs regardless of size and in hard to access areas.
From road signs to billboards to commercial signage, the Surefoot footing enables a quick installation that is suitable for both permanent and temporary signage with the ability for removal, reuse and reinstallation as required. A multi-purpose footing, the Surefoot system is an innovative alternative in all construction applications where a concrete footing can be used.
The Surefoot steel footing system offers instant bearing capacity with no curing time and the ability to be installed, removed and reused in separate locations as required. Delivering a distinct advantage over the use of traditional foundations in the construction of both temporary and permanent bridges, it is suited for use in difficult to navigate areas. This revolutionary footing system has minimal impact on the surrounding flora and fauna and will not erode river banks.
Reducing the need for heavy equipment traditionally required for earthworks, the Surefoot system offers precision and efficiency and will enable both the construction and use of a bridge within the same day. With untapped potential within many industry’s including the military this innovative concrete free footing system will continue to revolutionise the way builders and the construction industry operate.
The use of Surefoot in the erection of turbines offers a cost effective and time efficient alternative to the traditional concrete footing. Turbines are more commonly located in remote areas that require a higher cost of labour and construction materials. The Surefoot steel footing system significantly reduces labour time and requires a smaller volume of materials, ensuring profit margins are heightened.
Due to the compact nature of the Surefoot system a foundation for a multiple wind turbine may fit into the back of a ute eliminating the costly need for a cement truck and excavator to be driven on site in which to dig the foundation.
With an average installation of 10 minutes, choose the cost effective, market leading steel foundation from Surefoot. Call today on (03) 9354 4950 to discuss your residential and small extension structural needs.